Details: new road construction second stage 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od453683/2024-2025:(od from dar 60.7.1 ) - dry rubble masonry _ dry rubble without concrete levelling course masonry with good qualityblasted rubble including packing to compactness to lines and levels cost and conveyance of all materialslabour charges etc. complete as per direction of departmental officers at site od453711/2024-2025:filling with contractor own earth (excluding roack) in open areas in layers notexceeding 20 cm in depth,consolidating each deposited layer by ramming and watering,lead up to 50 m andlift up to 1.5 m as per direction of site engineer - in - charge od387489/2024-2025:filling with quarry muck filling up low lying and water logged areas with local material/ quarry mu
Sector: RDPR