Details: side wall construction 11.1.1.1:excavation for structures earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. ordinary soil (i) upto 3 m depth 75.7.1:dry rubble masonry with hard stone, including through/bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. 11.4.4:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 iv. r.c.c grade m 20 11.8:supplying, fitting and placingtmt bar reinforcement in foundation complete as per drawings and tech
Sector: RDPR