Details: reatarring & concreting 3.15.2:compacting original ground (ii) compacting original ground supporting subgrade loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.1 and 300.2 for subgrade construction as per technical specification clause 303.5.2. 3.2:preparation of foundation for embankment scarifying existing bituminous surface to a depth of 150 mm by mechanical means scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. od399377/2024-2025:od/mord/01/691945 filling up low lying and water logged areas with local material/ quarry muck,spreading in layers, leveling the top at site and consolidation by ramming, etc complete forimproving the cbr value of subgrade 4.9:wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet
Sector: RDPR