Details: road concrete and side wall 11.1.1.1:excavation for structures earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. ordinary soil (i) upto 3 m depth od317580/2024-2025:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br> i. p.c.c grade m 10 <br> (i) nominal mix 1:3:6 11.4.2.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 ii. p.c.c grade m 15 (i) nominal mix (1:2.5:5) od317609/2024-2025:filling with contractors own earth (excluding rock) in open areas in layer and not exceeding 20cm in
Sector: RDPR