Details: road renovation 3.2:preparation of foundation for embankment scarifying existing bituminous surface to a depth of 150 mm by mechanical means scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 3.5.2:excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od392685/2024-2025:granular sub-base/base/surface course with serviceable material available during scarifying of existing road. construction of granular sub-base with departmental material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achie
Sector: RDPR