Details: side protection for kampiliyil peedika 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od487126/2024-2025:filling up low lying and waterlogged areas with local material/ quarrymuck,spreading inlayers, levelling the top at site and consolidation by ramming, etc complete for improving the cbr value ofsubgrade. od487215/2024-2025:dry rubble masonry-dry rubble without cocrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc.complete as per direction of deparatment officers at site(modified spec 607.1 of dar) od487100/2024-2025:surface dressing of the ground in all kinds of soil including removing vegitation in equalities not exeeding 15 cm deep and disposal of , lead up
Sector: RDPR