Details: road renovation od477810/2024-2025:construction of subgrade and earthern shouldersconstruction of subgrade and earthern shoulders with approved material obtained from borrowpits with all lifts and leads,transporting to site spreading ,grading to required andcompacted to meet requirementsof table300.2 with lead upto 1000m as per techanicalspecification clause 303.1 od473357/2024-2025: granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once andcompacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as per technical specification clause 408. (ii)using gravel mix soil
Sector: RDPR