Description: State Plan23 24 Setting Up of Laboratory Waste Water Treatment Facility to Quality control District and Sub District Labs under Alappuzha District General Civil Work Work Name State Plan Setting Up of Laboratory Waste Water Treatment Facility at District Lab Alappuzha Alappuzha District Waste Water Treatment Facility at District Lab Alappuzha Alappuzha District General Civil Work
Details: Pipe Laying 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete 50.18.7.4.2:Providing and fixing PVC, pipes fittings including fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 32 mm dia 6 Kgf/cm2 - internal work- Exposed on wall 50.18.7.6.1:Providing and fixing PVC pipes
Sector: Water supply and Sewerage