Details: protection wall 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth od308381/2024-2025:dry rubble masonry with hard stone in foundation and superstructure includingpacking to compactness to lines and levels, cost and conveyance of all materials labour chargesetc. complete as per approved drawing and relevant technical specifications. od308408/2024-2025:od254191/2019_2020 :dowel bars - supplying and providing ms dowel bars of size 16 mm dia of 90cmlong (60cm in rock and 30cm in concrete ) including drilling holes of 20mm dia to a depth of 30cm in rockand filling the gap with cement grout( 0.0.060kg/each) etc com
Sector: RDPR