Details: retaining wall 3.8.2:excavation in ordinary rock with dozer with lead upto 100 m excavation for roadway in ordinary rock by deploying a dozer d-50 including cutting and pushing the cut earth to site of embankment upto a distance of 100 m (average lead 50 m), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross-sections with lift upto 1.5 m. 11.4.2.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 ii. p.c.c grade m 15 (i) nominal mix (1:2.5:5) 3.4:construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 od37503/2023-2024: dry rubble masonry _ dry rubbl
Sector: RDPR