Details: drainage construction 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth 2.5.2.b:dismantling of structures<br> dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per technical specification clause 202.<br> (ii) by mechanical means <br>(b) reinforced cement concrete 2.15:dismantling of cement co
Sector: RDPR