Details: drainaige 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od63762/2024-2025:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br> (modified form 11.4.1.1 work excluded)i. p.c.c grade m 10(i) nominal mix 1:3:6 11.4.2.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 ii. p.c.c grade m 15 (i) nominal mix (1:2.5:5)
Sector: RDPR