Details: tile road od151863/2024-2025:scrarifying the existing bituminous road surface to a depth of 50mm and disposal of scrarified material with in all lifts and lead upto 1km (by mechanical means od151862/2024-2025:filling with quarry muck filling up low lying and water logged areas with local material/quarry muck, spreading in layers , leveling the top at site and consolidation by ramming ,etc complete for improving the cbr value of sub grade 4.11.2:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as per technical specification clause 408. (ii) using gravel mix soil. od151864/2024-2025:supplying and laying interlocking cement concrete paver block tiles 80mm o
Sector: RDPR