Details: road od146901/2024-2025:supplying and fixing bamboo post 2.0 m long 1.00m below bed level 30 cm c/c and 1/2 split bailing pieces 5 nos 10 m long tying od146904/2024-2025:construction of sub grade and earthen shoulders construction of sub grade and earthen shoulders with approved material obtained from borrow pits with alllifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. (3.14 modified with increased compensation and additional conveyance od146903/2024-2025:quarry muck/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing at once and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as per technical specification clause (ii)using gravel mix
Sector: RDPR