Details: appendix a od2164/2024-2025:handling conveying and fixing the automatic shutter of sluice in position including allcharges for conveying from bund and fixing the sluice in position etc. complete as per the direction for the departmental officers at site. od2165/2024-2025:conveying and fixing the wooden posts and automatic shutters for the sluice incorrect position including all charges etc. complete as per the direction of departmental officers at site1 no. beldar for assisting 1/2 day od2166/2024-2025:removing the automatic shutters from sluice aand conveying the same to convenientplace etc. complete as per the direction ofthe departmental officers at site. od2167/2024-2025:removing wooden posts from sluice and conveying the same to onvenient place etc.complete. 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and l
Sector: Irrigation