Details: improvements od278117/2024-2025:construction of subgrade and earthen shoulders construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. od278118/2024-2025:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniformlayers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as pertechnical specification clause 408. (ii)using gravel mix soil.(quarry muck) 4.9:wet mix macadam <br> providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including
Sector: RDPR