Details: road concrete 11.1.1.1:excavation for structures earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. ordinary soil (i) upto 3 m depth od264945/2024-2025:dry rubble masonry _ dry rubble without concrete levelling course masonry withgood quality blasted rubble including packing to compactness to lines and levels cost andconveyance of all materials labour charges etc. complete as per direction of departmentalofficers at site 11.4.3.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203iii. p.c.c. grade m 20 (i) nominal mix (1:2:4) 11.2.2:fillling in foundation trenches as per drawing and technical specification c
Sector: RDPR