Details: construction of culvert 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 3.7:removal of unsuitable soil with disposal upto 1000 m <br> removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per clause 303.5.2 as per technical specification clause 302.3.11 od207940/2024-2025: filling with quarry muckfilling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade (modifed dar 51.2.3) 11.4.1.1:providing concrete for plain/reinforced concrete in open foundations complete as pe
Sector: RDPR