Details: road work 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od289136/2024-2025:(od from dar 60.7.1) dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labor charges etc. complete as per direction of departmental officers at site 75.8.1.1:providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4) 11.8:supplying, fitting a
Sector: RDPR