Details: foot path concrete od228944/2024-2025:surface dressing of the ground including removing vegetation and in-equalities notexceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5m in all a kinds of soil od228943/2024-2025:granular sub-base/base/surface course with local materials (table 400.13) by mix inplace method normal. construction of granular sub-base by providing local materialspreading in uniform layers on prepared surface, mixing by mix in place method withrotavator at once etc.. complete (without roller & grader) 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4) od228942/2024-2025:mord:providing and fixing name board fixed over ms sheeting 2mm t
Sector: RDPR