Details: for road concreting od238362/2024-2025:filling with contractor own earth (excluding rock) in open areas in layers notexceeding 20 cm in depth, consolidating each deposited layer by ramming andwatering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-incharge od238365/2024-2025:filling with quarry muck <br> filling up low lying and water logged areas with localmaterial/ quarry muck, spreading in layers, leveling the top at site and consolidation byramming, etc. complete for improving the cbr value of subgrade 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4)
Sector: RDPR