Details: new road construction od249170/2024-2025:compacting original ground<br> (ii) compacting original ground supporting subgrade<br> loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.1 and 300.2 for subgrade construction as per technical specification clause 303.5.2.(excluding roller compacttion) od249175/2024-2025:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers by manual means on prepared surface, mixing by mix in place method manually at once as per clause 401.4 as per technical specification clause 408. <br>(ii) using gravel mix soil.(excluding roller compaction) 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requ
Sector: RDPR