Details: drain od210669/2024-2025:engaging man coolies od210670/2024-2025:earth work excavation in or under water by mechanical means/manual means 0.9cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5m and lead upto 1000 m etc. as per technical specification clause 302.3.6. od210671/2024-2025:ring bund type-i-putting up ring bund as per approved shape 2.m bottom width,<br>1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in<br>between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund<br>after completion of the work etc. complete.<br>modified 60.1.1<br> od210672/2024-2025: bailing out water using pump above 5hp and up to 10hp - bailing out<br>water with engine and pump set above 5hp and up to 10hp, including conveyance to site and ,cost<br>of fuel, lubrication oil and other stores, pay of staff etc complete&l
Sector: RDPR