Details: road concreting 8.3.2.a:earthwork in hill road<br>(ii) excavation in hilly areas in soil by mechanical means <br> a) excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per technical specification clause 1603.1 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4) 75.8.1.1.a:providing plain cement concrete for wearing coat cc 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required as required including compaction, finishingand tamping etc .complete. max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc comp
Sector: RDPR