Details: for road concreting 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 3.2:preparation of foundation for embankment scarifying existing bituminous surface to a depth of 150 mm by mechanical means scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. od251382/2024-2025:filling with quarry muck <br> filling up low lying and water logged areas with localmaterial/ quarry muck, spreading in layers, leveling the top at site and consolidation byramming, etc. complete for improving the cbr value of subgrade 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber
Sector: RDPR