Details: drain 11.1.1.1:excavation for structures earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. ordinary soil (i) upto 3 m depth od318660/2024-2025:stone dry rubble masonry work in foundation complete as per drawing and technical specifications-dry rubble masonry 75.8.1.1.a:providing plain cement concrete for wearing coat cc 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required as required including compaction, finishingand tamping etc .complete. max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification(i) nominal mix (1:2:4) 11.8:supplying, fitting and placingtmt bar reinforcement in foundation complete as per drawings and technical specif
Sector: RDPR