Details: pond renovation 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 15.9.2:demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer -in- charges:in cement mortar 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil od257954/2024-2025:dry rubble masonry(deptl.stone) _ dry rubble without concrete levelling course masonry with good quality blasted rubble (using deparmental stone) including packing to compactness to lines and levels cost and con
Sector: RDPR