Details: road renovation 2.7.d:dismantling stone masonry as per technical specification clause 202.<br> dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per technical specification clause 202.<br> (d) dry rubble masonry 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth od257656/2024-2025:dry rubble masonry with hard stone, excluding through/bond stone in foundation andsuperstructure including packing to compactness
Sector: RDPR