Details: road renovation od160158/2024-2025:scarifying metalled (water - bound) road surface including disposal of , lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity. 4.9:wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400.11 & 400.12 and technical specification clause 406. by mechanical means with 1 km lead 75.5.5.a.1pb:modified macadam 50 mm thick using bitumen s-65 - packed bitumen rates construction of macadam over prepared base by providing a layer of compacted crushed
Sector: RDPR