Details: sheet roofing 50.10.2:steel work for purlin/single section with g i pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete 4.1.3:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size) 10.16.1:steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.hot finished welded type tubes 10.25.1:item shifted to sub head 14 as item 14.73item shifted to head 14 as item 14.74steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming co
Sector: RDPR