Details: road retarring od249195/2024-2025:scarifying existing road surface to a depth of 150mm and compacting the aggregates obtained from scarifying with power roller,as per direction of departmental officials at site 3.5.2:excavation in soil with dozer with lead upto 100 m <br> excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od249270/2024-2025: construction of granular sub base/base/surface course with local material spreading in layers,levelling the top and compacting with smooth wheel roller as per technical specification(quarry muck filling with roller compaction) 4.9:wet mix macadam <br> providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage o
Sector: RDPR