Details: nadapatha concrete (ch: 0/00mtr. onwards) 3.5.2:excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od231144/2024-2025:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers on prepared surface, mixing by mix in place method with rotavator at once and compacting with manually complete as per clause 401.4 as per technical specification clause 408. <br>(ii) using gravel mix soil. ( without roller compaction) 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredinclu
Sector: RDPR