Details: footpath concrete. od95546/2024-2025:surface dressing of the ground including removing vegetation in equalities notexceeding 15 cm in depth and disposal of rebbish lead up to 50 m and lift up to 1.50 m od95547/2024-2025:filling up low lying and water logged areas with local material/ quarry muck,spreading in layers, leveling the top at site and consolidation by ramming, etc od95548/2024-2025:providing concrete for plain/reinforced concrete in open foundations complete asper drawings and technical specifications clause 802, 803, 1202 & 1203iii.p.c.c. grade m 20(i)nominal mix (1:2:4)
Sector: RDPR