Description: AZAD ROAD SECOND REACH ROAD CONSTRUCTION IN MADAKKATHARA GP Work Name Annual Plan PR 341 24 25 AZAD ROAD SECOND REACH ROAD CONSTRUCTION IN MADAKKATHARA GP AZAD ROAD SECOND REACH ROAD MADAKKATHARA General Civil Work
Details: NEW ROAD CONSTRUCTION 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per
Sector: RDPR