Description: Pr NO 358 25 KUNNUMMAL BADUVATHOTTY ROAD BALANCE PORTION ROAD CONCRETING IN UDUMA GRAMA PANCHAYATH Work Name Annual Plan UGP PRO NO 358 2024 25 KUNNUMMAL BADUVATHOTTY ROAD BALANCE PORTION ROAD CONCRETING General Civil Work
Details: ROAD CONCRETE 3.15.2:Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding
Sector: RDPR