Details: building15.9.1:demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer -in- charges:in lime mortarod211006/2024-2025:dr with departmental stone-dry rubble masonry without concrete levelling course using departmental rubble including packing to lines and levels, labour charges etc complete as per direction of engineer in charge 2.7.1:earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.ordinary rockod211005/2024-2025:dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour
Sector: RDPR