Details: pathway3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3od194935/2024-2025:dry rubble masonry with hard stone, foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.od195011/2024-2025:dry rubble masonry with hard stone, foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc.depart mental material complete as per approved drawing and relevant technical specifications.od194917/2024-2025:granular sub-base with well graded material (table 400.1) <br> (a) by mix in place method <br> construction of granular sub-base by providi
Sector: RDPR