Details: maintenance 3.2:preparation of foundation for embankment <br> scarifying existing bituminous surface to a depth of 150 mm by mechanical means <br> scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 3.7:removal of unsuitable soil with disposal upto 1000 m <br> removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per clause 303.5.2 as per technical specification clause 302.3.11 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od71975/2024-2025:filling of quarry mu
Sector: RDPR