Details: kuzhakkal junction karimbumkandam 0/000- 0/170 3.2:preparation of foundation for embankment scarifying existing bituminous surface to a depth of 150 mm by mechanical means scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. od194057/2024-2025:granular sub-base/base/surface course with serviceable materials available (deptlmaterial) during scarifying of existing road. construction of granular sub-base by providinglocal materialspreading in uniform layers with motor grader on prepared surface, mixing by mix in placemethod withrotavator at once and compacting with smooth wheel roller to achieve the desired densitycomplete as perclause 401.4 as per technical specification clause 408.(modified 4.11.2) 4.11.2:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by prov
Sector: RDPR