Details: laying and jointing pvc pipe. heading earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge. all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering - all work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. providing and laying flooring in concrete of specified grade excluding the cost of cantering and shuttering but including cost of finishing and levelling the top floor surface - 1:1½:3 (1 cement: 1½ coarse sand (zone-iii) derived from natu
Sector: Agriculture Misc