Details: tile laying od177032/2024-2025:construction of subgrade and earthern shoulders with approved material obtained fromborrow pits with all lifts and leads, transporting to site spreading , grading to requiredslope and compacted to meet requirement of table 300.2 with lead up to 1000m as pertechnical specification clause 303.1 6.1.a.1:granular sub-base with well graded material (table 400.1) <br> (a) by mix in place method<br> construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. <br> (i) for grading i material od177031/2024-2025:providing and laying 80mm thick factory made cement concrete interlocking paver block of m-40 grade made by block making machine approved size, shape and design with crushed stone bed as pe
Sector: RDPR