Details: tiling 3.2:preparation of foundation for embankment <br> scarifying existing bituminous surface to a depth of 150 mm by mechanical means <br> scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. od198653/2024-2025:providing and laying of inter locking concrete block pavements using 80mm m40 hydraulic blocks of approved size, designs& shape , laid in required pattern over and including a compacted bed of 6mm stone aggregate of 50mm average thickness etc. all complete as per the direction of engineer in charge od198655/2024-2025:filling with quarry muck.filling up low lying and water logged area with local material/quarry muck, spreading in layers,levelling the top at site and consolidation by ramming etc complete for improving the cbrvalue of sub grade 75.8.1.1.a:providing plain cement concrete for wearing coat cc 1:2:4 (1 cement: 2 fi
Sector: RDPR