Details: road maintainance od147219/2024-2025:construction of subgrade and earthen shoulders &it:br&gt: construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lift and leads transporting to site ,spreading grading to required and compacted to meet requirement of table 300.2 with lead up to 1000 m as per technical specification clause 303..1with out roller (kuttanadutaluk ,veliyanadu) od147220/2024-2025:filling up low laying and water logged areas with local material /quarry muck ,spreading in nlayers ,levelling the top at site and consolidation by ramming etc complete (4.1.b.1 modified with qurry muck )
Sector: RDPR