Details: annual maintanence of enath iii distributory and its field boothies 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil od1243/2024-2025:engaging coolie for removing floating bodies and other vegetations from canals and depositedsilt from canal bed , construction of temporary bunds across canals for control and regulate theflow of water and for greasing of shutters etc complete during water distribution period as perthe departmental officers at site. 15.2.1:demolishing cement concrete m
Sector: Irrigation