Details: road work 2.1:clearing grass and removal of clearing grass and removal of up to a distance of 30m outside the periphery of the area as per technical specification clause 201. by manual means od5668/2024-2025:filling with soil gravel mixture/quarry waste spreading in uniform layers on prepared surface,levelling the top and consolidation by ramming etc complete for improving the cbr value of subgrade clause 408.(based on 4.11.2) 4.9:wet mix macadam <br> providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400.11 & 400.12 and technical specification clause
Sector: Harbor