Details: constructing compound wall at anayam 3 ll ohsr site. 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil 2.9.1:excavation work by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.ordinary rock 4.1.6:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate
Sector: Water supply and Sewerage