Details: working charges 100.1.1:excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. 100.98.230:supply of pvc pipe, 10kg/cm2, 25mm dia. od114882/2024-2025:supplying & fitting 30mmx30mm gp square tube sections including all labour charges,conveyance charges ,painting charges, etc complete od114883/2024-2025:supplying & fitting 25mmx25mm gp square tube sections including all labour charges,conveyance charges ,painting charges, etc complete od114884/2024-2025:supplying & fitting 20mmx20mm gp square tube sections including all labour charges,conveyance charges ,painting charges, etc complete o
Sector: Water supply and Sewerage