Details: app a canal lining 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 15.2.2:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:4:8 leaner mix ( including equivalent design mix) 60.1.2:ring bund type ii putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. 60.2.2:bailing out water using 5hp pump- bailing out water with 5hp engine and pump set including conveyance to site and ,cost of fuel, lubrication oil and other s
Sector: Irrigation