Details: modern cattle shed 2.28.1:surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m.all kinds of soil 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil od1440/2024-2025:dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site od1441/2024-2025:random rubble masonry with hard stone in foundation and plinth including levelling up up to plinth level with: ce
Sector: Agriculture Dept