Details: renovation of pond od193139/2024-2025:surface dressing of the ground including removing vegetation and in equalities not exceeding 15cm deep and disposal of ,lead up to 50mand lift up to 1.5m all kinds of soil. od193496/2024-2025:pumping or bailing out water and removing slush etc by using pumpset including cost of labour, oil hire charges of pumpset etc complete 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth 75.7.1:dry rubble masonry with hard stone, including through/bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials l
Sector: RDPR